How much time needed to renovate a kitchen?

Kitchen renovations are a huge scheme, and the job can take up to several weeks. 3 big steps on how much time needs for kitchen renovations are:

  1. Unseen damages or asbestos on the floor
  2. The requirement of Structural work
  3. Plumbing and Electrical works

Working with Professionals

If you work with a professional kitchen designer like JXF Painting Service, you need at least 6 to 8 weeks for the design to be finished. In this period, it means to take time for the meeting with JXF Painting Staff, the time that staff makes the required measurements and developing a draft plan before starting the work. We suggest you sit with us and to make sure that everything is in the right way and also to ensure that you are happy before finalizing the designs.

The Cabinets

If you want to order custom based cabinets, then you need to wait for about 4-12 weeks for the cabinets to be made. In cases when you need imported materials, you have to wait a little bit more. Have different ways of cabinets, depending on the kitchen form, but we always choose the best for your kitchen. We also recommended you for the models that are more comfort related to your kitchen position.

The first step we take

For the new cabinets to be installed, the old furniture needs to be removed. The work could take just a day. The preparation work includes plumbing, electrical, and flooring works. JXF Painting Service takes care of everything depending upon the significant structural changes.

Work of Installation

After the cabinets are sent to your place, then the installation work is quick, assuming that no mistakes are made. Before they came we take care to make the correct measurements and also take care to install the cabinets correctly so that you can use them for many years to come.

Installation of New Appliances

The final step in the kitchen renovation is the installation of the appliances. The process is straightforward and quick but give at least 1 to 2 days for the completion of work. You should also figure out the way to dispose of the old appliances. Just let us help you. We also clean the old appliances as a part of the service.

The end of Kitchen Renovations